- THREE new umbrellas to be installed adjacent to north end of lap pool - these join the five installed last season
- two picnic tables to be relocated perpendicular to eastern fence
- Jake’s organised a banner at Blackheath Station on opening day, and there’s a poster on each side of the station platform
- Brickwork paving over balance tank is being completed today
- Lawn topsoil is being laid today, awaiting some drainage of waterlogged lawn area before laying turf
- Ttell folks to check their Uncle Tobys cereal boxes for the free kids Learn to Swim passes
- All Pools are now filled & circulation system is running – water is 23°C today ;)
Monday, December 6, 2010
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment