Friday, May 18, 2012

Drainage works begin

BMCC has begun work on the very wet lawns above the swimming pool. It will look a mess for a little while, but be worth it in long-run.  
Thanks to Daniel Long, BMCC Program Leader, Operations for organising work. He notes "Whilst doing the works we encountered a phenomenal amount of groundwater and in order to try and drain the water into an open channel have created a series of trenches.  We intend to run drainage lines in these trenches before backfilling with a suitable material."


No comments: